Date Range
Date Range
Date Range
Wednesday, October 9, 2013. Windows are backed with sheet styrene for support and will be filled in. Windows covered up with Squadron White Putty. Scribed panel lines are okay, but parts fit is average at best. Engine nacelles cut at the fan blade position in order to eliminate intake seams. Sunday, August 18, 2013.
Sunday, June 9, 2013. However, it still builds up well with a little TLC. No interior hanger bay is included in this kit, so I used some styrene sheet to produce a representative bay so I can park some aircraft in there. It will look fine as long as no one gets in there with a flashlight. Once it dries, you can paint it! The aircraft decals are small and numerous.
Wednesday, July 10, 2013. Since I just started this new single project per blog sytem, I had to ditch everything I had previously written on Shuttle Wars. Although the YouTube videos will still feature a portion devoted to comparison of the Monogram and Revell orbiters, I thought I would break them up into separate blogs. So here are all of the most important photos of the Revell shuttle posted all at once, without the original captioning.
Page n 1 sur 5.