Date Range
Date Range
Date Range
SRD 364 - ARCHITECTURE 3B - 2008. Thursday, October 23, 2008. This is my poster for the final presentation. Not everything went according to plan, but. This is my final post for Archi 3B,. Wednesday, October 22, 2008. Sunday, October 19, 2008. Detail of the wall and door frame connection of an Acoustic door. This is the final planning for building B and C. Sunday, September 28, 2008. Saturday, September 27, 2008.
Wednesday, October 22, 2008. In the semester passed, it has opened up my eyes to a number of variations that can be undertaken in the and implemented in architecture. Not to undermine all of my other environmental sustainability subjects, but the element of research and actual design of a building of this type was a big learning curve, and one i intend on carrying through my career. Better acoustic insulation - improve noise protectionWith a d.
Friday, October 24, 2008. The master plan and our individual models. Thursday, October 23, 2008. My Library and the Arts. The plaza space, where students can interact and perform. The timber foldable panels that acts as sunshading and create nice shadows for students in the dance and arts rooms. Friday, October 10, 2008. Saturday, September 20, 2008. Dinesh- AUditorium and sports hall.
Tuesday, October 28, 2008. Ground Plan and First floor Plan. North elevation and East Elevation. East-West Section and North-South Section. Monday, October 27, 2008. Im designing the library, M. Ultimedia centre and student recreational room. Some sketches of my design. What is required in a.
Thursday, October 23, 2008. The eaves running along the north facade provide shade for the internal spaces while the timber louvers allow for natural ventilation and passive cooling. The north facade receives maximum winter sun for passive heating. The thermal mass walls also provide adequate heating for the cooler months. This image shows the lvl beam to steel bracket connection on the east entrance.