Date Range
Date Range
Date Range
Scroll Down for DoubleDome Trending 2014. Spring 2013 Flowers and DoubleDome Creatures. MDP SSI Back Pay Resolution. More Adventures and Other Dome Blogs.
Friday, September 30, 2011. Double Dome Acrylink 2011 Re-Painting. John Applying Acrylink Caulking While Hanging. Helicopter owned by local mine owner. Major patch in bathroom extension of little doom. Two barrels of Acrylink G roofing material. Double Dome from O Road. Painting of Double Dome Completed.
Friday, December 30, 2011. Clockwise Internal Vue April 2011. Amy Michelle on Power Platform. Thursday, December 29, 2011. Stair Railings Constructed Reused Material. Wednesday, December 28, 2011.
Saturday, August 4, 2012. Double Dome Kitchen Before Remodel. Double Dome Kitchen Remodel Begans. Double Dome Kitchen Construction 2011. Double Dome Kitchen Construction 2011.
Tuesday, October 11, 2011. Scissor lift on south side of dome. Scissor Lift is beside Bottom of 5 story scaffold. We added more layers of plywood where we maneuver scissor lift. Monday, October 10, 2011.
Thursday, December 1, 2011. Thousand Gallon Private Propane Tank. 500 gal Amerigas Propane Tank. Sand piled for base of Tank. Excavation of Large Hole for Private Propane Tank. Hole is Completed for 1000 gallon Propane Tank. 1000 gallon Propane Tank Arrives. Plastic Cover Provided for Tank Opening. Plastic Tank Opening Surrounded by RR Ties. 2011 Family Home Survival Projects. 2011 SSI Back Pay Resolution.
Monday, January 2, 2012. Wednesday, December 28, 2011. Gizmo Looking for New Home. 2011 SSI Back Pay Resolution.
Big Marble - Maazoetsoh Portal. Saturday, May 30, 2009. E O Rd Neighbor Vue of Dome. Vue of our Dome from our E. Vue of East O Rd Iris Neighbor. Vue of our Iris Neighbor to East from our Dome. Friday, May 29, 2009. E O rd Neighbor Iris. E O rd Neighbor Iris.
Thursday, August 12, 2010. Wednesday, August 11, 2010. Front Porch Location 19991211 TBI. Blood stain visible on sidewalk. This is at end of. Edge of Roof Location 19991211 TBI.
Friday, December 30, 2011. Clockwise Internal Vue April 2011. Amy Michelle on Power Platform. Thursday, December 29, 2011. Stair Railings Constructed Reused Material. Wednesday, December 28, 2011.
Saturday, August 4, 2012. Double Dome Kitchen Before Remodel. Double Dome Kitchen Remodel Begans. Double Dome Kitchen Construction 2011. Double Dome Kitchen Construction 2011.
Tuesday, October 11, 2011. Scissor lift on south side of dome. Scissor Lift is beside Bottom of 5 story scaffold. We added more layers of plywood where we maneuver scissor lift. Monday, October 10, 2011.
Thursday, December 1, 2011. Thousand Gallon Private Propane Tank. 500 gal Amerigas Propane Tank. Sand piled for base of Tank. Excavation of Large Hole for Private Propane Tank. Hole is Completed for 1000 gallon Propane Tank. 1000 gallon Propane Tank Arrives. Plastic Cover Provided for Tank Opening. Plastic Tank Opening Surrounded by RR Ties. 2011 Family Home Survival Projects. 2011 SSI Back Pay Resolution.
Thursday, June 27, 2013. Most of my work is in embedded systems that involve no OS at all, or contain nothing more than a framework to start work from. To make things a bit more chaotic, a lot of my work also involves designing hardware as well as writing appropriate firmware for the hardware that has been designed.