Date Range
Date Range
Date Range
Sunday, November 14, 2010. Carmel tunnels, a major transportation project aimed to provide a fast alternate route for crossing the city of Haifa, is planning to open soon. HTS LPR systems are a major part of its toll collection system. PC-based systems on the two 12-lane plazas. The LPR systems were integrated with the lane controllers which control the payment and authorization functions. The picture below shows one of the entry lane.
להפעלת מנגנון עקיפת בלוקים לחצו Ctrl. מנהרות הכרמל בחיפה הינן מערכת כבישי אגרה, המקצרת באופן משמעותי את הזמן הנדרש לחציית העיר ואת הנסיעה מצפון לדרום וחזרה למגוון יעדים. כל הזכויות שמורות למנהרות הכרמל.
Wednesday, June 22, 2011. What an experience this afternoon was! Throughout tonight we are going to try to have different team members write a post about their experiences. The entire family stood in the driveway as we drove off and waved. As promised, here are more pictures. One of the many beautiful ch.