Date Range
Date Range
Date Range
Sunday, July 5, 2015. Fitted the port inner gunwale after making the aft knees from pitch pine 1 inch thick stock. I used carton to make a simple template for them. To keep the gunwale in its place i used the new Ryobi nailer tool. Claps for the pressure in combination of a nail or two to prevent moving. That nailer saves me a lot of time and rework. Excellent tool advise from JW. Port gunwale glued and tacked.
Sunday, January 20, 2013.
With the fuel tank sorted the cockpit is progressing well. The prep work I have done is starting to come into play. The inspection port is to access the keel bolts just inside. Then it was time for a vacuum and clean up ready to run the exhaust hose. I also cut a hole for a hatch into .