Date Range
Date Range
Date Range
Sunday, May 30, 2010. Studio Task Wednesday 02 June 2010. My email note to you noted that this week, I need you all to have. 2 Interior perspective vignettes showing the main sequence of spaces. These components should be as complete as possible as I will be unable to provide constructive feedback if substantial work is not produced. So please work hard this week and try to catch up. Attention to light quality and experience.
Sunday, June 13, 2010. The chosen site is a connection Camperdown Memorial Park and the busy King Street. The Art Gallery is a continuous passage that takes patrons on a journey between the Memorial Park and the main street, while inviting them to enjoy the displays of contemporary paintings, installations, and sculptures. The north-oriented outdoor space provides a sunny lookout towards the park and a Sculpture Park behind the gallery. Artists for Newtown Art Gallery.
ARCH 1201 - DESIGN STUDIO 2ND YEAR. Wednesday, June 16, 2010. Great Session - Thanks guys. Thanks to you all for a great semester. I have enjoyed myself very much and I wish you all the best for the rest of your degrees. I was pleased with the final presentations and I am sure you will agree that the guest critiques were very helpful and inspiring. You will hear from me via email to student accounts with your grades for the final submission.
Wednesday, March 10, 2010. Parti diagrams - what to focus on. A great start to the session with some great thinking and discussion happening in studio. I wanted to clarify what to focus on with your parti diagram analysis. During studio, we discussed the villas with individual groups and looked at some reference documents. We explored different aspects of spatial organisation that can be analysed with parti diagrams.
ARCH 1201 - Design Studio 3. Tuesday, April 20, 2010. I assume you all know by now that there will be no tutorial meeting tomorrow. Have a good week - see you all next Wednesday,. Thursday, March 11, 2010. WEEK 1 - CLARIFICATION OF POINTS. Bawa house, section cuts for the model - The plan cut in this case may be more effective, though .
Thursday, June 10, 2010. Through these experiences, you are guilded from the large gallery to the smaller galleries upstairs which then lead you into the shop fronting King Street. Scales noted are only indicative of the scale used for the original drawing and therefore does not apply in terms of the electronic images of the original.
Tuesday, June 1, 2010. I have decided to have an art gallery base on origami and other contemporary forms of Paper art. Tuesday, May 25, 2010. Sunday, May 9, 2010.
David Sananikone z3220086 - B. Tuesday, June 8, 2010. This servies as the main focal point of the building and also the main source of light for the art gallery. This portrays that the sun repre.
Wednesday, June 9, 2010. Sunday, May 9, 2010. My model design is a symbolic translation of my passage; every architectural feature represents a meaning.
Wednesday, June 15, 2011. PROJECT THREE - DOUBLE HOUSE - SITE ANALYSIS. PROJECT THREE - DOUBLE HOUSE - CONCEPT 1. It was abandoned in favour of a single built element with the landscape areas integrated into the overall volume.
This is the place where you can personalize your profile! By moving, adding and personalizing widgets. You can drag and drop to rearrange. You can edit widgets to customize them. The bottom has widgets you can add! Some widgets you can only access when you get Core Membership.
Tuesday, October 28, 2008. Final Checklist for Assignment 3. Thursday 30th October, Midnight. Emustore Submit ARCH1390 Representation Studio - Harkins Assignment3. Minimum of two embedded animations.